Generally, it takes 2 weeks from the technical drawing to the sample. Please note, this excludes the time spent communicating and revising during the process, as well as sourcing any specific stones or findings needed to create the sample. Each design is considered on a case-by-case basis, and we will discuss the timeline with our team and the client.